RAICO is proud to have carried out the installation works and commissioning for 5 brand new generators at Palm City in Tripoli Libya. The 5 generators provide a total power output of 4.7MVA. Works included coordination with multiple stakeholders and suppliers, termination and commissioning of each generator to make sure works were carried out to the highest of standards.
The installation, commissioning and change-over works from the old equipment to the new installation were all carried out in an impressive 6-day window, leaving very little downtime for the client.